This Daikin Package Unit was installed by our experienced team at Westbrook Tavern, 5 minutes from Toowoomba. The ductwork was installed through the eave and into the roof space where it will replace three ducted split units. Stage 1 involved getting the ducting up to the units, ready for the cutover. Stage 2 was to decommission the ducted splits, dismantle and remove. Ducting was then connected to existing to complete this install.