Our recent project at Pindara Private Day Surgery involved the replacement of the recovery ward main AC unit. The unit had been built into a basement plant room during construction, leaving limited options. The replacement unit was custom constructed by Temperzone specifically to suit the application. The plant room wall was removed to allow adequate access to remove the existing unit, making way for the new Temperzone unit. With some engineering changes and NEW duct design, our team were able to transform a tight plant room with limited access into a workable area for the new unit. When a job looks to be too difficult, there is always a solution.
Home » PINDARA PRIVATE DAY SURGERY BENOWA