Our recent Pacific Square project saw our team decommision a number of old redundant air conditioning units including the ductwork which we then craned down from the rooftop.

A new replacement unit was then craned into position, new ductwork measured, manufactured and installed to suit the new installation. Controls were also upgraded with digital timers.