We completed a number of projects this month, two of them being at Ashmore City Shopping Centre on both projects we worked around the tenancies to minimalise the noise levels and have the units up and running for trading on the Monday morning.
The unit was old and beyond repair at the Grow On Tenancy and required a full replacement. We decommission the existing split ducted typed unit. Fabricate duct transitions to connect to the existing duct work complete with through roof penetrations including under and over flashing then installed a Temperzone OPA294RKTBH 29.5kw roof top package unit. All duct work was made in galvanised steel with internal insulation complete with fresh to comply with AS1668.2. Once all was in place we then commissioned and tested the unit.